Location: High Point, NC Construction: New Construction Owner: Piedmont Development Size: 2,200 SF
Fourth Elm Construction demolished an existing building prior to new site work and construction of this Starbucks in High Point. The shell of this building was created by a wood frame with a masonry veneer. The entire project required 40,000 bricks and 1,150 SY of asphalt paving.