Additions to Clemmons Town Center

Fourth Elm Construction is the General Contractor on the new 6,900 sf building consisting of structural steel with an EPDM roof. The exterior will be a mix of 4 different colors of EIFs, as well as CMU and brick to finish the exterior facade. In addition, there will be an aluminum storefront, a mixture of hanger rod and fabric awnings. The site will include a retaining wall with a NCDOT guardrail, light and heavy duty asphalt paving and heavy duty concrete paving.

The full article can be found here:

Article

Big Plans for High Point Retail

Fourth Elm Construction is thrilled to be the General Contractor for a new retail shell in a high-profile location of High Point, NC. At 1913 and 1923 N. Main Street, we will provide demolition of the existing buildings and parking lot prior to constructing a new, 15,309 sf, four tenant retail shell and parking lot. The retail shell features EIFs, masonry and modern awnings.

The full article can be found here:

Article